Project Summary
Country

Sierra Leone

Location

Kenema District

Project Category

Environmental; Resettlement

Tasks

Preparation of an ESIA, ESMP and RAP

Client

Nokorko Resources Ltd

Status
Start

2024

End

2024

Budget

$75 Million (USD)

Have a project in mind? 

ESIA and RAP Addendum on the Bekongkor III Hydropower and Transmission Line Project

Project Brief

CEMMATS was contracted to undertake an ESIA and RAP on the Bekongkor III Hydropower and Transmission Line project in Kenema District. The Hydropower scheme is planned to have an installed capacity of 120MW, and will involve the installation of a 35km transmission line. The project area is along the Sewa River in the Gorama Mende Chiefdom of Kenema District, Eastern Sierra Leone.

The Result